From a 100L brew bar to a 1000L+ brewery: KRS designs the layout, fabricates, installs and transfers recipes — one partner for the whole project.

per batch
100L – 1000L+
brewhouse layout
2 / 3-Vessel
heating method
Electric / Steam
optional automation
Siemens PLC

Choose your scale

Reference configurations for each scale. Our engineers tailor them to your site and target output.

Reference configuration100 – 200 L / BATCH
Reference configuration: Pub / Bar 100 – 200 L
Batch size
100 – 200 L
Vessels
3 vessels (MLT · kettle · whirlpool) + HLT
Heating
Steam — 18 kW electric boiler
Automation
PID control panel + VFDs
Fermenters
3 × 200 L + 2 × 400 L unitanks
Monthly output
1,500 – 3,000 L
Brewhouse footprint
25 – 40 m²
Power supply
30 – 45 kW

Equipment for this scale

Pick the right configuration

2-Vessel3-Vessel
Brews per day1 – 22 – 3
Brewhouse footprint≈ 5 m²≈ 8 m²
Operators11 – 2
Investment25–35% lowerHigher
Best forPub / bar 100–200 LVenues & breweries 300 L+
ElectricSteam
InvestmentLowerHigher (needs boiler)
Heat-up speedSlower on large batchesFast and even
Sweet spot≤ 300 L≥ 300 L
Site needs3-phase powerBoiler + steam piping

Turnkey services

  • 3D CAD floor-plan design

    Brewhouse, fermentation, cold room and piping laid out on your actual site — review it before any work starts.

  • Fabrication & installation

    304/316L stainless equipment, installed, pressure-tested and commissioned on site.

  • Recipe transfer & training

    Operator training, CIP cleaning and a base recipe set for your tap list.

  • Warranty & maintenance

    12-month warranty against manufacturing defects, plus hotline tech support.

How we deliver

  1. 01Site survey & capacity planning
  2. 023D CAD layout + itemised quote
  3. 03Fabrication, installation, commissioning
  4. 04Recipe transfer & operator training

FAQ

How long does fabrication take?

It depends on the configuration: about 8–10 weeks for a 200L 2-vessel system and 12–14 weeks for a 500L 3-vessel, before installation.

What does my site need?

3-phase power (or a boiler for steam heating), floor water supply and drainage, and space for fermenters. A KRS engineer will survey and send detailed requirements.

Do you install outside Ho Chi Minh City?

Yes. KRS delivers and installs nationwide; travel costs are itemised in the quote.

What warranty do you offer?

12 months against manufacturing defects (not covering damage from misuse), plus hotline tech support.

Ready to plan your brew bar?

Send your floor plan and output goals — get a proposed configuration and quote within 24 business hours.

Request quote & floor-plan design